Results-driven production professional prepared for demanding roles in manufacturing and operations management. Proven track record of enhancing production efficiency and maintaining high-quality standards. Focused on team collaboration and adaptability to changing project needs, with strong skills in process optimization and leadership.
Operations Management
Cost reduction
Capacity planning
Material Planning
Assembly and production
Maintenance planning
Training skills
Production planning
Production scheduling
Root-cause analysis
Purchasing
Project management
Continuous improvements
Lean manufacturing
Production data analysis
Six Sigma - Green Belt from AIGPE
· Team Member for Improvement of KE in Manual lines from 50% to 60% in 2017
· Project leader for Improvement of KE in Manual lines from 60% to 70% in 2018
· Inter Sector Versatility Improvement from 2% to 40% within Dec 2018 by doing this optimizing 10 Manpower in 2019 onwards.
· Reduction in number of turns in B1 winding for Jumbolino, savings of 5.2L/annum
· Localization of gas nozzles, savings of 7.8L/annum
· Lean flow for natural curing area
· Lean & ergonomic flow for curing & leak test process
· Reduce BHT & AHT deviation
· Reduce inventory in shop floor location
· Winding speed improvement to improve OEE
· Layout modification in winding for flexible operation & reduced 1 manpower in each shift
· SMED fixtures to avoid change overtime
· Wet line concept
· Change of timings of master samples testing, before it was start of shift now in break timings
· Included Soken testing in line itself to avoid waiting for parts, before it was a separate station
Special Projects:
· Layout optimization in spraying area, Altering direction of spraying booth - Space savings by 125Sq.Mt
· Modified Zinc wire drum & trolley to avoid ergonomic issue
· Improvement of production output from 1600 capacitors per day to 1900 capacitors per day against the target of 2000.
· Reducing sound level & dust level in spraying area
· Implemented Bins for smaller diameter capacitors instead of Trolleys to avoid thread damage & modified trolley for capacity enhancement