Summary
Overview
Work History
Education
Skills
Timeline
Certification
Projects
Achievements at EMI Solutions
Achievements
Generic
BHARATHIVELU G

BHARATHIVELU G

Senior Manager - Production
Hosur

Summary

Results-driven production professional prepared for demanding roles in manufacturing and operations management. Proven track record of enhancing production efficiency and maintaining high-quality standards. Focused on team collaboration and adaptability to changing project needs, with strong skills in process optimization and leadership.

Overview

22
22
years of professional experience
4
4
Languages
1
1
Certificate

Work History

Senior Production Manager

EMI Solutions Private Limited
10.2021 - Current
  • Allocated workloads effectively to Production Supervisors to ensure smooth workflow and productivity.
  • Ensured timely completion of daily production activities as per Work Orders and lead times.
  • Achieved 98% On-Time Delivery (OTD) by executing monthly capacity and production planning aligned with customer requirements.
  • Developed and maintained monthly production and billing plans; prepared KPI reports and delivered performance presentations.
  • Collaborated cross-functionally with Quality, Sales, Engineering, Purchase, and Warehouse teams to meet delivery timelines.
  • Proactively followed up on material requirements and alerted Purchase department about shortages to avoid production delays.
  • Designed, tested, and implemented manufacturing processes based on product specifications and consulted with machine/equipment vendors.
  • Ensured product and process quality through the development and implementation of rigorous testing methods and standards.
  • Managed Work Order approval process, including ERP checks, hardware listing, purchase requests, and in-house production planning.
  • Compiled and analyzed production data to identify trends and discuss improvement strategies with the team.
  • Maintained equipment uptime through preventive maintenance scheduling and coordination with service providers.
  • Monitored breakdown history, critical spares, and machine maintenance logs to ensure operational readiness.
  • Planned and executed team training and multi-skilling programs to build a flexible and capable workforce.
  • Provided coaching, performance feedback, and policy enforcement while leading customer audits and facility visits.
  • Maintained ISO-compliant documentation, conducted 8D analysis for customer complaints, and reduced line rejections and rework.
  • Conducted time studies for standard products to enhance efficiency and balance production lines.
  • Led line modifications to boost capacity, utilization, and productivity.
  • Supported New Product Development (NPD), PPAP, sample construction, APQP, PFMEA, and Control Plan creation.
  • Designed new tools and fixtures to improve productivity and process efficiency.
  • Spearheaded process improvement and cost-saving projects, including changeover time reduction, manpower optimization, and consumable usage minimization.
  • Reviewed production metrics and guided teams in minimizing process variation and waste through monthly meetings.
  • Motivated teams to identify bottlenecks and supported the implementation of continuous improvement (CI) projects.
  • Led and reviewed Kaizen, Poka-Yoke, and suggestion schemes to reduce complaints, internal rejections, and quality risks.
  • Strengthened visual management systems through effective use of Visual Aids, Quality Alerts, and standardized Work Instructions.

Production Manager

Schneider Electric
04.2015 - 10.2021
  • Managing manufacturing process to ensure product is delivered on time and under budget while maintaining quality standards; Utilizing Lean Manufacturing strategies to improve manufacturing processes and reduce costs
  • Planning and executing the production schedule including human and material resources; resolving employee relationship issues, evaluate conflicts and determine disciplinary actions
  • Enhancing efficiency of production by migrating employees and equipment to maximize utilization thru multi skilling; planning workflow manage multiple priorities and meet daily production targets while consistently reducing downtime
  • Communicating frequently with other departments like Planning, Quality, Methods, Maintenance, design, and warehousing to ensure that project timelines and delivery schedules will be met (SIM - 1 and 2)
  • Conducting weekly actual vs. planned production output comparisons to identify opportunities to boost efficiencies with new process technologies; Developing new procedures and processes to improve production accuracy
  • Acting as part of team that implements several digitization projects like Order Launch, LDS (Lean Digitization System), Order tracking, E-Kanban, Automation
  • Led, supervised and managed over 200 employees with full task for recruiting, interviewing, hiring and training of personnel within 90% of capacity
  • Maintained team efficiency by delegating daily activities, monitoring output and rewarding positive contributions; drove 5S & as a team member to achieve the SPS score of 3.17 & lead 5S & visual management clause, scored 4 out of 5
  • Directed day-to-day production & manufacturing operations, quality & projects through effective utilization of man, machine, method & materials
  • Spearheaded the activities related to Operations & Maintenance up to bottom line; defined operational budget of the Unit and drove cost control measures to contain expenses within budgetary limits
  • Optimized the resources and improve the productivity, continuous journey; administered & managed top-notch assignments and reversed losses into profits


Assistant Production Manager

Schneider Electric
04.2014 - 03.2015
  • Led and headed the team of Engineers & Supervisors and achieved 96% OTDS & 90% PSR; worked for improvement of KE from 40% to 60%, Reduction of Changeover time by SMED
  • Enhanced the service quality and reliability by improving workflow and optimizing maintenance processes; developed and implemented manufacturing processes to maintain product functionality and cost efficiency
  • Implemented stage-by-stage Quality Monitoring System through latest technology trends to ensure adherence to technical specifications and benchmark the quality standards
  • Ensured that preventive maintenance is appropriately scheduled & accomplished, and emergency troubleshooting & maintenance support are readily available; scheduled material procurement plan and ensured optimum inventory level

Production Engineer

Schneider Electric
12.2010 - 03.2014
  • Executed work as per the schedule released by planning & maintained FIFO as per customer requirement; achieved 95% OTDM continuously
  • Updated production reports on daily & monthly basis, discusses the same with Production Manager
  • Discussed with co-team members about daily production, material issues, process issues, technical issues
  • Maintained Fixtures, Jigs, Consumables & Tools using in production; interacted with quality for process issues, with Methods & design in New Products
  • Reported MDR on daily basis to quality & conducted root cause analysis
  • Sustained Kanban System and reduced Inventory carrying cost & created Pull System in Production
  • Implemented check sheets for Production monitoring acted as Team Member of Sunrise Project & Converted all old products to new Version

Associate - 1 Operations

Goodrich Aerospace
06.2008 - 11.2010

Production Engineer

Advanced Micronic Devices Limited
02.2003 - 06.2008

Education

AMIIE (B.Tech) - Manufacturing Engineering

Indian Institution of Engineers
04.2001 -

No Degree - Diploma In Electrical And Electronics Engineering

Vignesh Polytechnic
Tiruvannamalai, India
04.2001 -

High School Diploma -

Mary Memorial Matriculation School
Tiruvannamalai, India
04.2001 -

Skills

Operations Management

Timeline

Senior Production Manager

EMI Solutions Private Limited
10.2021 - Current

Production Manager

Schneider Electric
04.2015 - 10.2021

Assistant Production Manager

Schneider Electric
04.2014 - 03.2015

Production Engineer

Schneider Electric
12.2010 - 03.2014

Associate - 1 Operations

Goodrich Aerospace
06.2008 - 11.2010

Production Engineer

Advanced Micronic Devices Limited
02.2003 - 06.2008

AMIIE (B.Tech) - Manufacturing Engineering

Indian Institution of Engineers
04.2001 -

No Degree - Diploma In Electrical And Electronics Engineering

Vignesh Polytechnic
04.2001 -

High School Diploma -

Mary Memorial Matriculation School
04.2001 -

Certification

Six Sigma - Green Belt from AIGPE

Projects

· Team Member for Improvement of KE in Manual lines from 50% to 60% in 2017

· Project leader for Improvement of KE in Manual lines from 60% to 70% in 2018

· Inter Sector Versatility Improvement from 2% to 40% within Dec 2018 by doing this optimizing 10 Manpower in 2019 onwards.

· Reduction in number of turns in B1 winding for Jumbolino, savings of 5.2L/annum

· Localization of gas nozzles, savings of 7.8L/annum

· Lean flow for natural curing area

· Lean & ergonomic flow for curing & leak test process

· Reduce BHT & AHT deviation

· Reduce inventory in shop floor location

· Winding speed improvement to improve OEE

· Layout modification in winding for flexible operation & reduced 1 manpower in each shift

· SMED fixtures to avoid change overtime

· Wet line concept

· Change of timings of master samples testing, before it was start of shift now in break timings

· Included Soken testing in line itself to avoid waiting for parts, before it was a separate station

Special Projects:

· Layout optimization in spraying area, Altering direction of spraying booth - Space savings by 125Sq.Mt

· Modified Zinc wire drum & trolley to avoid ergonomic issue

· Improvement of production output from 1600 capacitors per day to 1900 capacitors per day against the target of 2000.

· Reducing sound level & dust level in spraying area

· Implemented Bins for smaller diameter capacitors instead of Trolleys to avoid thread damage & modified trolley for capacity enhancement

Achievements at EMI Solutions

  • Implemented new Automatic Test Equipment for Single and Three Phase EMI Filters, enhancing testing accuracy and reducing cycle time.
  • Deployed a Resin Filling Machine with HMI configuration, improving process consistency and control.
  • Installed a Programmable Reactor Winding Machine, enabling in-house production and eliminating outsourcing.
  • Introduced a Toroidal Coil Winding Machine to reduce manual operations and boost production efficiency.
  • Led Kaizen initiatives to eliminate non-value-added activities, standardize processes with schematic diagrams, and significantly reduce rework and assembly errors.
  • Redesigned shopfloor layout using lean principles to align with process flow, resulting in improved operational efficiency.
  • Achieved 98% On-Time Delivery (OTD) consistently for 9 consecutive months through strategic planning and execution.
  • Improved process reliability and quality by implementing pneumatic crimping, reducing manual errors and ensuring consistency.

Achievements

  • New Machine Implementation: Ensured uninterrupted spraying operations during the pandemic by introducing an ARC machine in place of the Flame machine (Oxygen & LPG-based).
  • KE Improvement: Contributed as a team member in improving KE from 50% to 60% in manual lines (2017).
  • KE Improvement: Successfully led a project to enhance KE in manual lines from 60% to 70% (2018).
  • Multiskilling & Versatility: Improved inter-sector versatility from 2% to 40% by optimizing manpower; 10 resources redeployed effectively from 2019 onwards.
  • Cost Saving: Reduced turns in B1 winding for Jumbolino, achieving annual savings of ₹5.2 Lakhs.
  • Cost Saving: Localized gas nozzles, resulting in annual savings of ₹7.8 Lakhs.
  • Process Improvement: Redesigned curing and leak test processes to ensure lean and ergonomic workflow.
  • On-Time Delivery & Customer Satisfaction: Reduced BHT and AHT deviation, improving customer satisfaction.
  • Inventory Management: Minimized shopfloor inventory by implementing lean stock practices.
  • Productivity: Increased winding speed, leading to significant improvement in Overall Equipment Effectiveness (OEE).
  • Lean Flow & Manpower Optimization: Modified winding layout to enable flexible operations, reducing 1 operator per shift.
  • Changeover Efficiency: Applied SMED fixtures and introduced Wet Line concept to minimize changeover time.
  • Productivity: Rescheduled master sample testing from shift start to break time, avoiding production interruption.
  • Lean Flow: Integrated Soken testing into the main line, eliminating waiting time at a separate testing station.
  • Space Optimization & Lean Flow: Altered the spraying booth direction, achieving 1200 sq. ft. of space savings.
  • Ergonomic Improvement: Modified zinc wire drum and trolley design to resolve ergonomic issues.
  • Productivity: Boosted production output from 1600 to 1900 capacitors/day, nearing the 2000/day target.
  • Workplace Environment: Reduced noise and dust levels in the spraying area, enhancing operator safety and comfort.
  • Customer Satisfaction & MDR Reduction: Introduced bins for smaller-diameter capacitors to prevent thread damage and redesigned trolleys to increase capacity.


BHARATHIVELU GSenior Manager - Production