Knowledgeable Team Leader with background in project coordination and successfully managing multiple tasks simultaneously. Delivered crucial support in organizing events and streamlining processes to enhance operational efficiency. Demonstrated proficiency in communication and problem-solving to improve team collaboration and project outcomes.
Work History
Tempering Coordinator
1 Year 11 Months
Techni-Glass | 06.2020 - 05.2022
I run a glass tempering line. With 4 people, I take raw untempered glass, temper the glass to certification standards and customers specs. I have to verify and log flatness along with break test to check temper of the glass. Then I make sure it has the correct: glass, paperwork, casing, and separation material.
Cutting Coordinator
2 Years 3 Months
Techni-Glass | 03.2018 - 06.2020
As a coordinator in cutting department, I planned what the cutters would cut for each day. Set up the glass and had the plans ready for the cutters when they arrived to work, through the day I would measure the glass to make sure quality was achieved also setup glass for the cutters to keep a steady pace with no downtime.
CNC Operator
2 Years
Techni-Glass | 03.2016 - 03.2018
On CNC edgers I was responsible for running quality parts to customer request. I maintained desired measurements with calibers and blue prints.
Supervisor
1 Year 11 Months
Techni-Glass | 04.2014 - 03.2016
I was responsible for edging department, I assured all edged or drilled glass was in specification for each customer also assisted in production goals. I was trained on CNC edging machines.
CNC Glass Cutter
3 Years 10 Months
Techni-Glass | 06.2010 - 04.2014
Here I took 72"x84" sheets of glass and programmed customer specific sizes in the computer to be cut then I would cut and retrieve the glass. I had to assure that the glass measurement was within .030 thousandths.
Laborer
3 Years 10 Months
Pipeline Construction | 03.2010 - 01.2014
I was certified to weld polyethylene pipe. I worked with a crew to install main gas and service lines. We installed, checked for leaks, and put line in service.
Setup Technician
11 Months
Assured Castings | 11.2004 - 10.2005
As a setup technician I setup each new job for the next run this consisted of getting the die set in machine, hooking all water, hydraulic, air lines, selecting the right plunger, and assuring everything was safe and working. Taking damaged die to get it fixed in die shop or storing dies in storage area properly.
Die Cast Machine Operator/Setup Tech
2 Years 11 Months
Assured Castings | 12.2001 - 11.2004
I ran a die cast machine. In doing so I maintained sprayer and ladle to ensure smooth quality castings. Made sure all the parts were complete and not missing or unfilled.
Patient Coordinator/Insurance Coordinator/Treatment Coordinator at Washington Park Dental CenterPatient Coordinator/Insurance Coordinator/Treatment Coordinator at Washington Park Dental Center
Associate Head Coach/Run-Game Coordinator/Offensive Line/Recruiting Coordinator at Pascagoula High SchoolAssociate Head Coach/Run-Game Coordinator/Offensive Line/Recruiting Coordinator at Pascagoula High School