Aspen Hysys
Seasoned chemical process engineer with over 9 years of experience in designing and optimizing chemical process plants. Dedicated to leveraging extensive knowledge in the field of process engineering to achieve organizational goals. Committed to utilizing intelligence and hard work to drive continuous improvement and deliver exceptional results.
❖ NUMALIGARH REFINERY EXPANSION PROJECT – MPMC & EPCM
➢ Preparation of Detail engineering P&IDs, Datasheet of LPG Treating Unit.
➢ Sizing LPG/Propylene Storage bullets & associated transfer pumps.
➢ Co orientated with Disciplines as a process point of contact
➢ Prepared Various Utility specifications for refinery
❖ PARADEEP PHOSPHATE LTD.-1500 MTPD Sulphuric acid based on DCDA process
➢ Worked as a assist lead Engineer and coordinated with client's and other disciplines during absence of lead Engineer
➢ Reviewing of vendor GADs, Datasheets & Hydraulics Calculations.
❖ RICC project(Saudi Aramco)1800 KTA polyethylene
➢ 3 trains(HDPE, LDPE,mLLDPE) popolyethylene production under SABIC License
➢ Reviewed Junior engineer's datasheets and calculations.
➢ Performed PSV sizing calculations for various reliving scenario's.
❖ KOYUNCU CHLOR ALKALI PLANT, TURKEY – FEED Phase.
➢ Preparation of Process Specification of HCL generation unit & Caustic equipment Sizing.
➢ Preparation of chlorine and caustic section of P&ID's.
❖ JAFURAH Gas Plant (Upstream & Downstream), Jafurah – FEED Phase (Saudi Aramco).
➢ Preformed Equipment sizing of Steam generation unit and preparation of P&IDs
❖ BUHASA DEBOTTLENECK, Abudhabi (Depressurization study) - EPC Phase (ADNOC).
➢ Performed Depressurization using ASPEN HYSYS Simulation for different scenarios.
➢ Performed Flare adequacy study using FLARE NET.
❖ DQUM PETROCHEMICAL PROJECT, OMAN – FEED Phase (DRPIC).
➢ Preformed Equipment sizing & PDS preparation of Various Utility Systems and offsites.
➢ Preparation of PFDs, P&IDs, HMB for Various Utility Systems and offsites.
➢ Performed API 650/620 Tank sizing and its
PVRV for Inbreathing and Out breathing based on API
2000.
➢ Prepared of Line List, Equipment List and Valve List.
➢ Reviewed and updated IFC P&ID's based on site mechanical completion.
➢ Reviewed pump datasheets and pump Curves
➢ Reviewed vendor documents for various water treatment equipment's
➢ reviewed vendor Operation manual's
prepared specification for Multiple effect evaporator, reverse osmosis plant,
Line Sizing
Pump Calculations
PSV Sizing
Tank Sizing
Vessel Sizing
P&ID,PFD,DPTD,MSD
Line List, valve List, C&E chart, Control Narrative
Aspen Hysys
PipeNet
Flare Net
Auto CAD
Bluebeam
HTRI