Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic
Maharajan Rajesh

Maharajan Rajesh

Chennai

Summary

Maintenance Mechanical Engineer with expertise in general maintenance and repair by align and manipulate sections of pipe or drill stem from a platform on the rig derrick during the removal and replacement of strings of pipe, or drill stem and drill bit .Reliable worker with strong mechanical aptitude and a willingness to learn. Talented problem-solver with personable and open style. Approached each day and unique challenges with enthusiasm, patience, and humor. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy.

Overview

8
8
years of professional experience
1
1
Certification

Work History

Service Engineer

German Gulf Enterprises Ltd,
02.2007 - 01.2009
  • New Project done for lifting oil well three pipe in RIG ,continuously with help of our
    Innovative power pack with three hydraulic cylinder in off-shore.
  • Modification work’s done in on-shore ,loading arm conversion to manual to automatic using PLC
  • Accurately read, understood, and carried out written instructions.
  • Assist in setting up, taking down and transporting drilling and service rigs
  • Operate and maintain drilling rig diesel motors, transmissions, pumps and drilling mud systems, and mix mud chemicals, cements and additives
  • Read gauges to monitor pressure, density, rate and concentration and adjust pumping procedure as required
  • Record mud flows and volumes and take samples
  • Supervise floor hands and laborers .
  • Assist the assistant driller setting up BOP changes rams rubber seals and packer, nipple up, nipple down, spud in BOP in the Well head, Conductor and connecting complex hose
  • Responsible for align and manipulate sections of drill pipe, heavy weight, drill collar on the derrick finger during pool out in the hole and replacement of drill pipe, heavy weight, drill collar and drill bit and BHA and tool join.
  • Assistant to the rig floor when handling BHA.
  • Attended monthly safety meetings to ensure machine operation safety.
  • Followed company procedures to maintain work environment in a neat and orderly condition.
  • Promoted shop safety by working in a safe manner.

Service Engineer

German Gulf Enterprises
02.2007 - 01.2009
  • Performed routine preventive maintenance to ensure that building systems operated efficiently.
  • Fix broke machines
  • Informed supervisors when machines needed major service.
  • Maintained compliance with company standards to perform all maintenance activities.
  • Installed, aligned, and balanced new equipment.
  • Accurately completed service reports and warranty forms.
  • Safe and efficient operation of dry and clean machines

Service Engineer

Gates Engineering Services
02.2007 - 01.2009
  • Investigated and implement ideas for quality improvement, increased productivity and cost reduction.
  • Verified that all process control parameters were being documented and followed at all times.
  • Immediately addressed all expired product dispositions.
  • Supervisor 20 employees by ensure that all the team member are in compliances with the company rules and regulations
  • Educated and coach team members on daily expectation to meet department goals.
  • Organized monthly safety meeting for team members within the Department.

Project Engineer

Gates Engineering Services
01.2011 - 12.2014
  • Worked closely with equipment maintenance engineers and technicians.
  • TASNEE – NO:2, LARGEST PETRO CHEMICAL COMPANY . Complete overhauling of 30,000 ltr Hydraulic tank ,Flushing lines by looping & servicing 54
    control stations, actuators ,which control’s the movement of Kubota valves –japan
    ( HYD.SYSTEM BY –HYDAC –GERMANY ).& trouble shooting done in P.P Extrusion Machines Leakage free in all stations.
  • Installed machinery, equipment and new and replacement parts.
  • The Communications Technician I performs fire-stopping procedures on fire walls, install sleeves, and pull cable through sleeves and core penetration.
  • The Communications Technician I will fully complete all IES COMMERCIAL paperwork accurately and on time (timesheets, material transfers, work orders, change orders, tool transfers and others as required).
  • The Communications Technician I adheres to and participate in all Company, customer and industry quality and safety standards and regulations.
  • The Communications Technician I will complete other responsibilities as assigned.


Project Engineer

Gates Engineering Services
01.2011 - 03.2014
  • Unpacked and assembled all new merchandise using variety of power tools.
  • Used hand tools to change worn cutting tools.
  • Installed, aligned, and balanced new equipment.
  • Maintained compliance with company standards to perform all maintenance activities.
  • Followed standards and procedures to maintain safe work environment.
  • Performed basic machine set up.
  • Install new machines in the company
  • Wrote maintenance reports
  • Attend monthly safety meetings

Senior Service Engineer

Gates Engineering Services
01.2011 - 12.2014
  • Collaborated with cross-functional teams to ensure seamless integration of new technologies into existing systems.
  • Optimized maintenance schedules, resulting in increased equipment reliability and reduced service costs.
  • Led training sessions for junior engineers, boosting their skills development and overall productivity.
  • Streamlined service processes for improved efficiency and reduced downtime in critical systems.

Education

Bachelor of Engineering Technology - Mechanical Engineering

Rose Mary Marticulation
Tirunelveli
07.2000

Skills

  • Strong mechanical aptitude
  • Good communication skills
  • Fast learner
  • Basic computer skills
  • Bilingual French/English
  • Equipment problem resolution
  • Strong mechanical skills
  • Strong team player
  • Strong Hydraulics Knowledge on hands
  • Supervisory experience
  • Industry safety equipment
  • Machining
  • Problem-solving abilities
  • Multitasking
  • Organizational Skills
  • Team Leadership
  • Safety Training
  • Self Motivation
  • Activity Planning and Coordination
  • Data Entry
  • Time Management
  • Problem-Solving
  • Teamwork and Collaboration
  • Group Supervision
  • Facility Operations

Certification

  • Safety regulation training by OSHA
  • Complete respiration fit test by total safety
  • trained  to operate the loader, bobcat and forklift
  • lockout tag out training
  • Hydrogen sulfide safety awareness training
  • Trained to Work on Heights places

Timeline

Project Engineer

Gates Engineering Services
01.2011 - 03.2014

Project Engineer

Gates Engineering Services
01.2011 - 12.2014

Senior Service Engineer

Gates Engineering Services
01.2011 - 12.2014

Service Engineer

German Gulf Enterprises Ltd,
02.2007 - 01.2009

Service Engineer

German Gulf Enterprises
02.2007 - 01.2009

Service Engineer

Gates Engineering Services
02.2007 - 01.2009

Bachelor of Engineering Technology - Mechanical Engineering

Rose Mary Marticulation
Maharajan Rajesh