MUGESH K

Construction Engineer (Front Lead)
Chennai

Summary

Adept at leading high-stakes EPC projects with an overall experience of 8 years in Oil and gas industries, including a notable tenure at Tecnicas Reunidas SA, I excel in blending technical skills with strong leadership abilities. Demonstrated expertise in construction management and crisis resolution, achieving significant cost savings and maintaining stringent quality and safety standards. Successfully executing a pioneering green hydrogen project, showcasing exceptional problem-solving skills and a commitment to innovation.

Overview

8
8
years of professional experience

Work History

Green Hydrogen Project (EPC-Blending H2 With LPG)

Construction Engineer -(Front Lead)
05.2024 - Current

The scope of the project is to build a hydrogen production unit through an electrolyzer in the existing facilities for an annual capacity of 23.5 tons. The amount of hydrogen produced is blended with the LPG line. This blending mixture (92% LPG, 8% H2) is used as a combustion fuel by Rockman Industries Limited, Tirupati.


  • Accountable for the comprehensive advancement and overall execution of the project as per approved drawings and standards.
  • Maintaining positive relationships with both client management and subcontractor management.
  • Developed cost-effective construction solutions to meet client requirements without sacrificing quality.
  • Compiling weekly and monthly progress reports, updating schedules, conducting work front analyses, and managing client billing, and preparing stage-wise documentation reports.
  • Addressing the issues arising on-site and collaborating with the project and other departments, and resolving them as soon as possible.

EPC for CDU - VDU, VGO, DCU Fired Heater Packages

Construction Engineer - Tecnicas Reunidas SA
08.2021 - 04.2024

The scope of the project includes Engineering, Procurement and Construction of Crude and Vacuum Distillation Unit, Vacuum Gas Oil Unit, Delayed Coker Unit -Fired Heater Packages (5 no's).

  • Managed construction projects from inception to completion, including heater mechanical erections, heater piping (utility and process coil), and fuel skid piping as per approved drawings and standards, ensuring project schedule and budget adherence.
  • Improved communication between team members through weekly review meetings and daily progress updates.
  • Conducted thorough site analyses to identify potential issues and implement preventative measures before they could impact project success.
  • Created project schedules and worked with contractors to assure work is completed properly and on time.
  • Optimized material procurement processes for reduced waste and increased savings on project costs.
  • Evaluated subcontractor performance regularly, providing constructive feedback for improved collaboration moving forward.
  • Maintained accurate documentation throughout all stages of the construction process to facilitate future reference or dispute resolution if needed.

EPC for CCR, NHT, HOH Fired Heater Packages

Junior Construction Engineer
12.2018 - 07.2021

The scope of the project includes Engineering, Procurement, and Construction Management of Continuous Catalytic Reforming Heater, Naphtha Hydro Treating Heater, and Hot Oil Heater (3 no's)


  • Good knowledge of structural and piping drawings and executing the jobs as per project schedules.
  • Responsible for the construction of piping activities, ensuring the availability of materials and piping spools to generate enough work fronts for erection and welding.
  • Systemization and preparation of piping, equipment, and package test packs, monitoring the test packs flow for system completion.
  • Coordinate with clients for MC walkdowns and punch closure.
  • Actively involved in ID-FD Fans, Dampers, Burners, and Soot blowers pre-commissioning works with vendor.
  • Actively involved in the successful completion of format punches given by BPCL and handing over the systems.
  • Responsible for achieving targets with full compliance of HSC and quality requirements.

EPC for DHDS, NSU Fired Heater Packages

GET - PJ Joshi Engineering Contractors
06.2016 - 11.2018

The scope of the project includes all mechanical-related works as per the PO assigned by TRSA for the Diesel Hydro Desulphurization Unit and Naphtha Splitting Unit Fired Heater Packages (2 no's)


  • Good knowledge of structural and piping drawings and executing the jobs according to design standards.
  • Mailing the daily progress report to Tecnicas Reunidas, which includes structural and piping erection, welding in running meters, scaffolding progress, and other site activities.
  • Recording the daily extra rectification jobs, apart from our work order, and reporting the project status and performance overview to the management.
  • Actively involved in the completion of all punches during pre-commissioning.

Education

Bachelor of Engineering - Mechanical Engineering

Park College of Engineering And Technology
Coimbatore
04.2001 -

Skills

  • Communication

  • Problem Solving

  • Leadership

  • Teamwork

  • Active Listening

  • Time Management

  • Crisis Management

  • Project Management

Languages

English
Bilingual or Proficient (C2)
Tamil
Bilingual or Proficient (C2)
Hindi
Bilingual or Proficient (C2)
Malayalam
Bilingual or Proficient (C2)

Timeline

Green Hydrogen Project (EPC-Blending H2 With LPG)

Construction Engineer -(Front Lead)
05.2024 - Current

EPC for CDU - VDU, VGO, DCU Fired Heater Packages

Construction Engineer - Tecnicas Reunidas SA
08.2021 - 04.2024

EPC for CCR, NHT, HOH Fired Heater Packages

Junior Construction Engineer
12.2018 - 07.2021

EPC for DHDS, NSU Fired Heater Packages

GET - PJ Joshi Engineering Contractors
06.2016 - 11.2018

Bachelor of Engineering - Mechanical Engineering

Park College of Engineering And Technology
04.2001 -
MUGESH KConstruction Engineer (Front Lead)