Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
DECLARATION
Summary of Skills
PERSONAL DETAILS
Achievements
Generic

Nirmal RM

Deputy Manager - Mechanical
Kovilpatti

Summary

Intend to build a career with a leading company in a high-tech environment with dedicated and committed people that will help me fully explore and realize my potential. Willingness to work as a key partner in a challenging and creative environment.

Overview

2
2
Languages
19
19
years of professional experience

Work History

Deputy Manager-Mechanical

Dalmia Cement Bharat Limited
04.2022 - Current
  • Performed preventive, predictive, and breakdown maintenance tasks for the raw material handling section and packing plant.
  • Circular Stacker (1200TPH) & Reclaimer (600TPH) – (Shenyang – China)
  • Additive Stacker (500 TPH) & Reclaimer - (150TPH) – (Shenyang – China)
  • Coal Stacker (1200 TPH) & Reclaimer - (150TPH) – (Shenyang – China)
  • Truck Tippler - 2 Nos. (100 TPH X 2) - (Perfect Hydraulics)
  • Roto Packer 16 Spout - 2 Nos. (240 TPH x2) - (Beumer)
  • Truck Loading Machine - 6 Nos (100 TPH x 6) - (Beumer)
  • Utilized SAP PM Module to streamline maintenance processes.
  • Proud with to be safety steward.
  • Certified Trainer for scaffolding arrangement.

Asst. Manager-Mechanical – Raw Material Handling

Dalmia Cement Bharat Limited
04.2018 - 01.2022
  • 5 years in Raw Material Handling Maintenance.
  • 7 years in Packing Plant Operation and Maintenance.
  • Managing Operation and Maintenance of the Packing Plant Section.
  • Implemented power-saving initiatives to reduce energy consumption.
  • Executed cost reduction programs to optimize budget management.
  • Training Subordinates about safety practices.

Sr. Engineer – Packing Plant Operation & Maintenance

Dalmia Cement Bharat Ltd
04.2015 - 01.2018
  • Packing Plant, Roto Packer – 3 Nos. (16 Spouts, 240 TPH) - (EEL)
  • Loaded trucks with materials for transportation to ensure timely delivery. – 8 Nos. (EEL) to achieve trouble free plant running and to achieve the maximum equipment reliability and availability
  • Experience in SAP PM module, spare planning and budget planning
  • Managed daily manpower and material planning, inventory control, and indenting to optimize resource allocation.
  • Implemented IMS and maintained safety practices and documentation in compliance with ISO 9000, 14000, and OHSAS 18000 standards.

GET & Engineer – Maintenance Mechanical

Jaypee Gujarat Cement Limited
10.2007 - 01.2011
  • Managed operation and maintenance of cement mill and packing plant section.
  • Cement Mill (Ball Mill-150 TPH) – L&T
  • Packing Plant, Roto Packer – 2 Nos. (12 Spouts, 150 TPH) - (ETIL)
  • Executed truck loading operations for six trucks at ETIL, facilitating efficient transportation.
  • Clinker bulk loading spouts, 2 Nos. – DCL India
  • Cement silo extraction & Bulk loading system
  • 2 years in Fabrication and Erection of steel structure Cement Industry
  • Executed operation and maintenance for cement ball mill and packing plant over 2 years.

Education

B.E - Mechanical Engineering

Raja College of Engineering and Technology
Madurai, Tamil Nadu
01-2007

Diploma - Automobile Engineering

Lakshmi Ammal Polytechnic College
Kovilpatti, Tamil Nadu

H.S.C. - undefined

S.B.K. Higher Secondary School
Aruppukottai, Tamil Nadu
01-2002

S.S.L.C - undefined

S.B.K. Higher Secondary School
Aruppukottai, Tamil Nadu
01-2000

Skills

SAP PM & MM Module, MS-Office & AutoCAD

Cost analysis and savings

Operations management

Performance improvements

Accomplishments

  • Reclaimer chain life increased implemented the innovative ideas for chain rotation method.
  • Packing Plant Bag burstage reduced from 1.67 % to 0.20%
  • Power reduced from 2.3 to 0.85 Kwh/Ton
  • 5S implemented and achieved the Role model plant.
  • Truck loader Modified from hanging type to luffing type.
  • Spout aeration system implemented for Roto packers.
  • Interconnecting the packer circuit from single belt bucket elevator.
  • Cement silo cleaning & Open airslide replacement work done within 12 days through Cardex blasting system

Timeline

Deputy Manager-Mechanical

Dalmia Cement Bharat Limited
04.2022 - Current

Asst. Manager-Mechanical – Raw Material Handling

Dalmia Cement Bharat Limited
04.2018 - 01.2022

Sr. Engineer – Packing Plant Operation & Maintenance

Dalmia Cement Bharat Ltd
04.2015 - 01.2018

GET & Engineer – Maintenance Mechanical

Jaypee Gujarat Cement Limited
10.2007 - 01.2011

S.S.L.C - undefined

S.B.K. Higher Secondary School

H.S.C. - undefined

S.B.K. Higher Secondary School

Diploma - Automobile Engineering

Lakshmi Ammal Polytechnic College

B.E - Mechanical Engineering

Raja College of Engineering and Technology

DECLARATION

I solemnly declare that a fore said details are truth to my belief and conscience. Place: Ariyalur – Tamilnadu Date: 2024-06-13 Yours truly, (R.M. NIRMAL)

Summary of Skills

Competent & result oriented Deputy Manager (Mechanical) with an experience of 15 years + currently at Dalmia cement Bharat Ltd.

PERSONAL DETAILS

  • Name: Nirmal. R.M.
  • Father's Name: Murugavel. M.R.
  • Date of Birth: 1985-06-07
  • Sex: Male
  • Marital Status: Married
  • Nationality: Indian
  • Current Salary: 14.25 Lac per Annum.
  • Expected Salary: Negotiable
  • Passport Details: R0980364 – Valid upto:2027-05-15

Achievements

  • Increased the service life of the reclaimer rack car chain by implementing an innovative chain rotation method.
  • Extended the service life of the reclaimer scraper chain by introducing an innovative chain interchange method.
  • Enhanced the service life of the circular reclaimer discharge chute from 8 months to 1.5 years.
  • Reduced packing plant bag burstage from 1.67% to 0.20%.
  • Reduced power consumption from 2.3 kWh/ton to 0.85 kWh/ton.
  • Modified the truck loader from a hanging type to a luffing type, eliminating frequent hoist motor failures.
  • Implemented a spout aeration system for roto packers, improving productivity and eliminating bag rounding issues.
  • Integrated the packer circuit with a single belt bucket elevator, improving operational efficiency.
  • Successfully completed cement silo cleaning and open airslide replacement within 12 days using the Cardox blasting system, significantly reducing shutdown time.
Nirmal RMDeputy Manager - Mechanical