Summary
Work History
Education
Skills
Timeline
Generic

Parker Mease

Knoxville,TN

Summary

Dynamic Graphic Installer with a proven track record at Power T Graphix, excelling in vinyl graphic installations that enhance brand visibility. Demonstrated exceptional problem-solving and time management skills, achieving high customer satisfaction through meticulous attention to detail and effective teamwork. Committed to quality control and continuous improvement in all projects.

Developed skills in fast-paced, high-demand environment, ready to transition into new field. Demonstrated ability in project management and client communication, ensuring timely and accurate project completion. Seeking to leverage these transferable skills to make meaningful impact in new professional setting.

Work History

Graphic Installer

Power T Graphix
06.2024 - 08.2024
  • Collaborated with design teams to create visually impactful graphics tailored to client needs.
  • Completed successful vinyl wrap installations for vehicles, increasing brand visibility for clients'' businesses.
  • Played a key role in meeting tight deadlines without compromising quality or accuracy, ensuring client satisfaction and repeat business.
  • Reduced material waste by accurately measuring surfaces prior to cutting and installing graphics.
  • Troubleshot complex graphic installation challenges effectively while maintaining high-quality standards throughout the process.
  • Visited sites before and after installations to inspect quality and operability.
  • Repaired damaged graphics or installed new ones.
  • Checked areas for correct materials and specifications.
  • Increased customer satisfaction by completing graphic installations in a timely manner.
  • Streamlined installation processes through meticulous planning, organization, and time management skills.
  • Improved project efficiency by maintaining an organized workspace and inventory of materials needed for each installation.
  • Optimized workflow by collaborating closely with other team members on large-scale projects.
  • Double-checked customer requests and specifications before installations.
  • Cultivated a positive work environment through open communication, teamwork, and collaboration among colleagues.
  • Worked across various locations with graphics and installation tools.

Education

High School Diploma -

Halls High School
Knoxville, TN
05-2025

Skills

  • Organizational growth
  • Surface preparation techniques
  • Hand-eye coordination
  • Physical stamina and strength
  • Quality control standards
  • Best practices implementation
  • Teamwork and collaboration
  • Time management
  • Attention to detail
  • Multi-tasking Abilities
  • Reliability
  • Adaptability and flexibility
  • Health and safety procedures
  • Task prioritization
  • Self motivation
  • Continuous improvement

Timeline

Graphic Installer

Power T Graphix
06.2024 - 08.2024

High School Diploma -

Halls High School
Parker Mease