Summary
Overview
Work History
Education
Skills
Educationalprofile
Totalprofessionalworkexperience
Jobprofilesummary
Teamworkskills
Problemsolvingskills
Personal Information
Knownlanguages
Disclaimer
Timeline
Generic

Ritesh Kumar

Assistant Project Manager
Chennai

Summary

To be a part of a dynamic and growth-oriented organization which will provide a challenging career and opportunity for learning with latest technologies available so that skills and knowledge can be utilized and broadened effectively.

Overview

9
9
years of professional experience
4
4
years of post-secondary education

Work History

Site In-charge

Changzhou Qingshan Energy Co.Ltd
Chennai
2 2023 - Current

Senior Project Engineer

BECIS
Pune
09.2022 - 02.2023

Site In Charge

Thermax Ltd.
Pune
01.2022 - 09.2022

Site Engineer

Forbes Marshall Pvt. Ltd.
Pune
02.2018 - 12.2021

Project Engineer

Shyam Metallics & Energy Ltd.
Sambalpur
07.2015 - 06.2018

Education

Bachelor of Engineering - Mechanical

VIIT Pune
Pune
08.2011 - 07.2015

Skills

Management of Various Departments like Fabrication, Erection, Installation and Commissioning of Oil & Gas Fired, Waste Heat Recovery Boiler and DSG Biomass Boiler

Planning & Organizing

Progress Monitoring & MIS

Welding process and estimation

Project Execution (EPC Project)

Liase with statutory bodies like PWD, NHAI, DM, FIRE, FOREST Department etc for permission and clearance for smooth execution of the proposed task

Working as Project Engineer to developed excellent ability to get along with many different types of people

An ability to relate well to people and help them cope with situations as mentoring

Highly skilled in construction management, project execution & engineering including planning, economic feasibility study, resource mobilization, installation, commissioning and performance testing

Effective communication & negotiation with strong analytical problem solving and organizational skills

Managing all techno-commercial matters including contract

MS OFFICE

Design: - Ansys, CATIA

Experience of working in multiple & volatile environments

Mapping the vision in line with company's requirement to suit the adverse situation so as to maximize the utilization of resources entrusted to me

Manage technical process & resolve technical issues pertaining to analyzing the problem related to the technical requirement

Demonstrated ability to work with any cross functional project teams to derive maximum output from the said team to accomplish the focused task without any ambiguity

Monitor availability of material in stores as per requirement to ensure desired inventory level, in case of material short fall, highlight the issues with seniors and resolves

Educationalprofile

BE (Mechanical), BE, VIIT, Pune University, 2015, 64.73%, H.S.C, Intermediate High School, Bhabua, BSEB, March 2010, 72.8%, S.S.C, Bal Vikas Vidyalaya, Sasaram, CBSE, March 2008, 77.8%

Totalprofessionalworkexperience

8.7 Years

Jobprofilesummary

  • Expertise in erection Operation and Maintenance of equipment's like power boilers, rotary kilns, Compressor, FD fan, ID fan, PA fan, ESP, Feed Water Pumps ,Steam piping,Feed water piping etc.
  • Experience in Installation, Commissioning and testing, Operate and maintenance of Mechanical equipments.
  • Exposure to Detailed schedule preparation,Monitoring&Control.Hands-on experience in supplier follow-up & Coordination.
  • A keen planner with expertise in handling project on development of new equipments, machinery etc. including technical calculation, technology transfer to the concerned workforce and techno-commercial operation.
  • Handling site conditions, shutdown conditions and de-bottlenecking at site.
  • Checks manpower levels and construction equipment/tool availability of subcontractor.
  • Advises subcontractor on construction methods with particular emphasis on compliance with safe working procedures.
  • Interfaces with other site departments, particularly project controls, material control and engineering, to maintain proper support for and control of subcontractor
  • Commercial acumen including follow up for payments and contractual closure of all projects.
  • Close monitoring of critical path activities is logged onto the systems.
  • Coordinating with site manager for smooth execution of site activities.
  • Preparing & submitting monthly status report.
  • Follow-Up with clients, vendors and other internal departments like purchase, production, quality control, dispatch, store and procurement.
  • Coordination with various engineering discipline to ensure complete compliance to specification before order is being placed.
  • Monitoring, Submission of progress reports & highlights major achievements of planned activities & area concern to management & Clients.
  • Expertise in all type of pipe line erection, emergency shut down due to failure of pressure parts of boilers, repair/maintenance of super heater coils, economizer coils, valves etc.
  • Experienced in handling complete project operation entailing planning, resource utilization, procurement and technical support, estimation, load flow calculation.
  • Possess technical knowledge with high sense of communication skill to espouse better team management.
  • IBR & PESO documentations.
  • Organizes training to new boiler operators.
  • Liasoning with local Authorities for taking NOC.
  • Conduct regular inspection of the sections for identifying any unsafe condition and take corrective action against them along with against those identified by employees and workers.
  • Vendor Development.

Teamworkskills

  • Achieved grade A+ in college project in final year, working in a team of four to Design and Manufacturing of Heliostat Under Sponsorship of Opel India Pvt Ltd. Pune
  • Long standing commitment of being a Project Engineer and ability to develop teamwork in others through erection and commissioning of 2
  • 38 TPH of WHR Boiler Make:-ISGEC, 2
  • 1.5 TPH,2
  • 2 TPH, 2
  • 4 TPH & 4
  • 8 TPH Oil and Gas fired Boiler and 4.5,12TPH,8TPH,10TPH TPH DSG Biomass Boiler & 2 TPH DSG Biomass Boiler Of Make Forbes Marshall and Forbes Vynke and 20.5 & 33 TPH waste Heat Recovery & ESP including Balance of Plant material ,Electrical and insulation work.
  • At each workplace in India, made a positive contribution to the work environment by being reliable, flexible, supportive and friendly towards colleagues.

Problemsolvingskills

Managed contactor complaints in Project handling roles by listening, ascertaining the problem and finding an appropriate solution, liaising with the manager when necessary.

Personal Information

  • Passport Number: N7532510
  • Date of Birth: 11/10/1992
  • Gender: Male
  • Nationality: Indian

Knownlanguages

  • English
  • Hindi

Disclaimer

I hereby declare that the above-mentioned information is true to the best of my knowledge.

Timeline

Senior Project Engineer

BECIS
09.2022 - 02.2023

Site In Charge

Thermax Ltd.
01.2022 - 09.2022

Site Engineer

Forbes Marshall Pvt. Ltd.
02.2018 - 12.2021

Project Engineer

Shyam Metallics & Energy Ltd.
07.2015 - 06.2018

Bachelor of Engineering - Mechanical

VIIT Pune
08.2011 - 07.2015

Site In-charge

Changzhou Qingshan Energy Co.Ltd
2 2023 - Current
Ritesh KumarAssistant Project Manager